Resource Innovations Africa. Sign in with the account RIA issued to you.
Resource Innovations Africa — site portal
Waste, compliance and asset records
Local preview from the imported sheets. Not connected to the database; nothing here is saved.
—%
of waste recycled or re-used in 2026 to date, measured on delivered weights against a site target of 95%.
—tonnes handled · — t to landfill
One record for the site. Everything RIA does at Pniel lands here: what was generated and where it went, the paperwork that proves it, the condition of the equipment, and the people doing the work. Select a section to open it.
Waste performance
Compliance and operations
The report follows the reporting period selected at the top. Choose a single month for the monthly report, or the year to date. Save as PDF opens the print dialog; choose "Save as PDF" as the printer. Excel downloads the figures behind the report.
Every load leaving site carries a waste manifest. The receiving facility signs it, and its weighbridge weight is the delivered weight used in the diversion rate. Certificates of recycling or safe disposal are filed against each stream monthly, with the facility's licence.
Illustration for discussion. The content below is sample layout, not site records. It goes live in phase 4 of the build.
Per loadmanifest issued
Signedby the receiving facility
Monthlycertificate per stream
Licensedfacility and route per stream
Manifest register sample rows
Date
Manifest
Stream
Receiving facility
kg
Certificate
24/09
RI-0000X
Cardboard bales
Kraaifontein MRF
4,120
Recycling cert
23/09
RI-0000X
Food waste
Animal feed (farmer)
2,860
Indemnity on file
22/09
RI-0000X
Effluent sludge
Composter
9,400
Composting cert
19/09
RI-0000X
Broken pallets
Pallet repair
1,180
Awaiting
18/09
RI-0000X
General waste
Licensed landfill
6,240
Weighbridge slip
12/09
RI-0000X
Lab and clinic waste
Medical waste treatment
85
Safe disposal cert
Facilities and licences per stream
Facility
Streams
Licence
Kraaifontein MRF
Paper, plastics, metal
Valid
Composter
Sludge, organics
Valid
Animal feed (farmer)
Food waste
Valid
Licensed landfill
General waste
Valid
Medical waste treatment
Lab, clinic
Renewal due
The asset register and inspection system already running at RIA's Coastal Park and Kraaifontein MRFs (maintenance.riafrica.co.za), extended to Pniel. Each asset carries a QR code; scanning it opens its log on a phone. Findings from the monthly site inspection are tracked to close-out with photographs.
Illustration for discussion. The content below is sample layout, not site records. It goes live in phase 3 of the build.
QRtag on every asset
Intervalnext service calculated
Photoson every inspection
Close-outfindings tracked
Asset register sample
Asset
Location
Interval
Next due
Compactor and bin lifter
Waste yard
14 d
In 9 days
Static baler
Sorting area
14 d
Due in 2 days
Heger press
Sorting area
30 d
In 21 days
Platform scale 600 kg
Weigh point
90 d
In 47 days
Wheelie bins 240 L
Departments
7 d
Overdue 1 day
Spill kit
Waste yard
30 d
In 12 days
Inspections sample
Inspection
By
Findings
Monthly site inspection
RIA operations
2 closed1 open
Weekly housekeeping
Site supervisor
No findings
Equipment pre-use checks
Operators, daily
All passed
Monthly site inspection
RIA operations
3 closed
RIA is certified to ISO 14001; its occupational health and safety system is aligned to ISO 45001. The site's controlled documents are held in RIA's document system and listed here with their review dates, so the current version is always the one in use.
Illustration for discussion. The content below is sample layout, not site records. It goes live in phase 4 of the build.
Document register sample
Document
Standard
Next review
Status
Site risk assessment (HIRA)
45001 6.1.2
Mar 2027
Current
Aspects and impacts register
14001 6.1.2
Mar 2027
Current
Legal register
14001 / 45001 6.1.3
Jan 2027
Current
Integrated waste management plan
14001 8.1
Dec 2026
Review due
SWP: compactor operation
45001 8.1
Feb 2027
Current
SWP: static baler
45001 8.1
Feb 2027
Current
SWP: emergency preparedness
45001 8.2
Feb 2027
Current
SWP: personal protective equipment
45001 8.1
Feb 2027
Current
Highest-rated risks sample
Hazard
Residual risk
Compactor and baler entrapment
Medium
Vehicle and pedestrian movement
Medium
Manual handling of bags and bins
Low
Sharps and contaminated waste
Low
Fire in the waste yard
Low
Incidents and corrective actions are logged against the risk they relate to and tracked to close-out.
Each role has a required set of training. The matrix shows who is current, who is due, and what has lapsed; certificates and attendance registers sit behind each entry.
Illustration for discussion. The content below is sample layout, not site records. It goes live in phase 5 of the build.
Training matrix by role sample
Role
Staff
Site induction
PPE
Manual handling
Compactor
Baler
First aid
Fire fighting
Site supervisor
1
✓
✓
✓
✓
✓
✓
Due
Compactor and baler operator
2
✓
✓
✓
✓
✓
n/a
✓
Sorter
6
✓
✓
1 due
n/a
n/a
n/a
n/a
Casual sorter
3
✓
✓
Lapsed
n/a
n/a
n/a
n/a
Monthly toolbox talks (PPE, manual handling, equipment safety, injury reporting) are recorded with attendance registers.
Evidence for Premier's ethical trade audits, organised by the SMETA pillars. The portal shows compliance status only. Personal records such as ID copies, contracts and payslips stay with RIA under POPIA and are made available to auditors on request.
Illustration for discussion. The content below is sample layout, not site records. It goes live in phase 5 of the build.
12people on site (sample)
100%signed contracts
100%paid at or above minimum wage
0open grievances
SMETA pillars sample
Pillar
What is checked
Evidence held by RIA
Status
Labour standards
Employment freely chosen, right to work, no child labour, written contracts
Contracts, ID and age verification
Compliant
Labour standards: wages and hours
Minimum wage, regular hours, overtime voluntary and within limits
Payslips, timesheets, daily registers
Compliant
Health and safety
Risk assessment, PPE issue, training, incident reporting
See ISO and Training sections
1 action open
Environment
Waste routed to licensed facilities, records kept
See Manifests section
Compliant
Business ethics
Anti-bribery, conflict of interest, grievance mechanism
Ethics declarations, grievance log
Compliant
Based on delivered weights: loads weighed on delivery to the recycler, composter, farmer or landfill, as recorded on the monthly logsheet and the manifests. These are the figures the diversion rate and the landfill off-set are calculated from.
—%
of waste generated was recycled or re-used in this period, against a site target of 95%.
—tonnes generated · — t to landfill
Diversion rate by month
Streams
Stream
Tonnes
Share
Total
100%
Tonnes by month and stream group stacked; hover a month for the split
Based on process weights, measured daily at the plant by department. General waste from each department is weighed before sorting, sorted at the waste area, and the residue goes to the compactor. From October 2026 it is captured daily from the photo of the weigh sheet posted in the site WhatsApp group, read automatically into the daily data sheet. Treat the daily figures as indicative (roughly 80% complete); the monthly report is the formal record. It covers general waste only; whey, boiler ash and the other bulk streams are on the Waste performance tab. Process weights show where waste is generated; they are not the figures the diversion rate is reported on.
By department
Department
Before sorting kg
To compactor kg
Recycled kg
Recovered
Days
Daily total before sorting
From the monthly logsheet. Invoicing is the contract fee plus additional general-waste and GEMS disposal charges; the recycling return is credited back. Visible to RIA and Premier site management only.
Cost per tonne processed rand per tonne, by month
Monthly statement
Month
Invoiced
Recycling return
Cost to company
R / t
The two sets of figures measure different things and are not expected to match month by month. Process weights are taken daily at the plant for each department. Delivered weights come from loads weighed at the receiving facility, and loads are bulked up to reduce transport costs, so a load delivered in one month can hold waste generated in the month before. Waste that has been sorted but is still on site waiting for a full load is in the process weights and not yet in the delivered weights. Formal reporting uses the delivered weights. This view puts the general-waste figures side by side so a sustained difference can be spotted. The checks below are on the completeness of the daily capture only.
General waste by month tonnes
Process weights (daily, at the plant)
Delivered
Month
Before sorting
To compactor
Recycled at sorting
General waste to landfill
Days captured
Capture checks
"Days captured" counts days with at least one department weight. The month total check compares the total written on the characterisation sheet with the sum of its daily rows.